Dyers

KPI’s available in Contract Distribution Relationships:

The KPI’s that can be presented are endless, particularly if the ‘Palm’ technology is adopted. Some possible KPI’s will be:

  • Actual arrival time Vs ETA
  • % Completed returns of empty pallets
  • % Completed returns of actual stock
  • Turnaround times at DC
  • Equipment Downtime
  • Equipment breakdown
  • Equipment Time utilisation
  • Equipment payload utilisation
  • Cost per case
  • Cost per pallet
  • Cost per hour
  • Average unloading time
  • Average travel time
  • Level of overtime
  • Accidents per manhours worked
  • Km per delivery
  • Km per load
  • Pallets per delivery
  • Drops per load
  • Accidents per kilometres travelled
  • Damages per pallets carried
  • Kilometres travelled Vs projected kilometers

About Us | Site Map | Privacy Policy | Contact Us | ©2004 Dyers Transportation